Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Availability: Out of stock - on backorder and will be dispatched once in stock (Delivery time unknown – contact us).
SKU: indAEPS
Mfr. part no.: AEPS
GTIN: 840256911930
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Height: 3
Length: 10
Weight: 4
Width: 5